EV Charging Cost

Cost to charge a Audi Q4 e-tron on GRIDSERVE

A 20% → 80% top-up costs £39.27 at GRIDSERVE's 85.0p/kWh PAYG rate, delivering 46.2kWh and roughly 144 miles of range — about 27.2p/mile.

Cost by SOC range (PAYG)

Session kWh added Cost Range added Cost/mile
10 → 80%53.9kWh£45.81168 mi27.2p/mile
20 → 80%46.2kWh£39.27144 mi27.2p/mile
0 → 100%77.0kWh£65.45241 mi27.2p/mile

How long will it take?

The Audi Q4 e-tron peaks at 175kW DC; GRIDSERVE's top chargers go up to 350kW. The session is limited by whichever is lower — in this case 175kW.

A 10 → 80% top-up takes around 29m, delivering an average of 112.0kW across the session.

Open the time calculator for a different SOC range, charger speed, or ambient temperature.

Worth knowing