EV Charging Cost

Cost to charge a MG 4 on InstaVolt

A 20% → 80% top-up costs £34.06 at InstaVolt's 92.0p/kWh PAYG rate, delivering 37.0kWh and roughly 132 miles of range — about 25.8p/mile.

Cost by SOC range (PAYG)

Session kWh added Cost Range added Cost/mile
10 → 80%43.2kWh£39.73154 mi25.8p/mile
20 → 80%37.0kWh£34.06132 mi25.8p/mile
0 → 100%61.7kWh£56.76220 mi25.8p/mile

How long will it take?

The MG 4 peaks at 135kW DC; InstaVolt's top chargers go up to 160kW. The session is limited by whichever is lower — in this case 135kW.

A 10 → 80% top-up takes around 27m, delivering an average of 95.0kW across the session.

Open the time calculator for a different SOC range, charger speed, or ambient temperature.

Worth knowing